• Steel Fabriction Workflow Example

    Emergency Access Gantry within a Confined Area

    broken image

    1: SCAN

    Image on the left shows existing railway arch's which were recently rendered in preporation of Survey before design works.

    broken image

    2: DESIGN / MODEL

    Utilising scan data a steel frame model is developed within the building envelop, incoprating design, coordination & required building regulations.

    broken image

    3: FABRICATE

    The model is divided into fabrication parts in the of an assembly sheet, individel part models & bill of materials

    broken image

    4: INSTALL

    Fabrication parts are assembled during manufacture to ensure componants are as designed aand fit for use. The final structure is finished and reconstructed onsite. A robotic total station is used to precisely setout bolt and connection points back into the building fabric.

    broken image

    5: VALIDATION

    A final scan is completed for installation Quality Audit.

    At the same time this process captures valuable record information required for client submission.

  • STEEL / MEP FABRICATION

    5 Steps to Success

     

    1

    Scan

     

    Using our in house digital team.

    We use industry leading techonlogy to digitally map a project creating a

    Digital Twin.

     

    Millions points of data points are captured providing the accuracy need from the start of the project

    2

    Design & Model

     

    A bespoke model can then be created within this mapped environment where it is analysed and tested.

     

     

    We are able to create multiple concepts to ensure we are meeting our clients needs.

    We also conduct installation and logistics. Timeline models which feed into step 4.

    3

    Fabricate

     

    Once a Model has been approved it is dissected into fabrication parts still within a virtual space ready for manufacture.

     

    These parts are then related to Bells Fabrication for Steel & Modular work and also to Bells M&E for services fabrication

    4

    Install

     

    Bells lifting and installation teams are briefed on logistics & installtion requirments planned in step 2.

     

     

    We incorporated Robotic setting out systems during this process ensuring they are working within tolerance.

    5

    Validate

     

    Final checks, our digital team periodically scans installed components, issuing compliance check reports after each visit.


    If a change has occurred then these reports are used to update the final record model before issuing it to our client. 

  • FABRICATION

    MEP & SPECIALIST COORDINATION DIVISION

    broken image

    Government Building - Fabrication via Trimbles Sysque

    True Fabrication within Revit MEP

    Bells Digital is the official training provider for Sysque Fabrication UK. Sysque is the only true native Revit and BIM to fabrication application.

    We Pride ourselves on producing real world modelling in partnership with the Trimble Group.